• After-conference opportunity for EuroMembrane participants.
  • Limited capacity with a couple of seats which will be put on waitlist.
  • Departure is on Friday September 13 from the Conference venue at 8.00 am.
  • Transfer is by bus, transportation cost is partially covered by participants with 10 EUR, the rest by General Sponsor.
  • Bus tickets can be purchased via the conference registration system in the separate registration form.
  • Please, make the reservation in advance by August 22, 2024.
  • Minimum number of participants: 20, maximum 40.

Tour 1: DIAMO, s.p.,o.z. GEAM Dolní Rožínka – former uranium mining site

DIAMO GEAM
  • The transfer takes about 2.5 hours (170 km)
  • 11.00 presentation in the meeting room – operation Rožná
  • 12.00 tour of the ED operation including pre-treatment (depending on the weather, the possibility of visiting the tailings pond)
  • Partner, company DIAMO, will provide a small refreshment before departure (water, baguette, biscuits)
  • Around 13.00 departure to Prague with arrival around 15:30 (depending on the Friday traffic on D1, delays must be expected)
  • Transfer is by bus, transportation cost is partially covered by participants with 10 EUR, the rest by General Sponsor.
  • Bus tickets can be purchased via the conference registration system in the separate registration form.
  • Please, make the reservation in advance by August 22, 2024.

Along with this excursion, we invite you to a lecture on Monday, September 9th, from 17.00 to South Hall 2B. The electrodialysis technology at Dolní Rožínka is the first and oldest reference of MEGA Water treatment from the uranium mining industry. Still in operation, its origins date back to the early 1980s. Uranium ore mining at this site started in 1957. The chemical plant has been in operation since 1968. However, it no longer processes uranium ore into a chemical concentrate – ammonium diuranate, but elution of U-metal sorbed on ion exchangers of decontamination stations during mine water treatment is still carried out. In the technological process of cleaning the tailings pond water of the plant, sodium sulfate is obtained as a by-product. Industrial electrodialysis technology has been operated at GEAM since 1989 thanks to MEGA. The tailings pond at Dolní Rožínka has a total volume of up to 14 million m3. The original salinity of the water in the tailings pond was 30 g/l. Electrodialysis with pre-treatment in the form of reverse osmosis has a design capacity of 33 m3/h, but at the current salinity of “only” 20 g/l it is able to process up to 40 m3/h. Theoretically, it would be possible to gradually “dry out” the entire tailings pond within 7-8 years, but it is awaited how the strategic issue of opening the deposit in nearby Brzkov will be resolved.

Tour 2: The Membrane Innovation Center of MemBrain and the production facility of MEGA

MemBrain MIC
  • The transfer takes about 1.5h (106 km)
  • From 10.00 presentation in the meeting room MIC – about 30 min
  • Discussion – about 20 min
  • From 11.00 tour of MIC I and the Production-assembly part of the MEGA a.s. plant (in groups of about 10 people)
  • Small refreshment before departure (water, baguette, biscuits)
  • Approx. 12.00 departure to Prague with arrival at approx. 14.00
  • Transfer is by bus, transportation cost is partially covered by participants with 10 EUR, the rest by General Sponsor.
  • Bus tickets can be purchased via the conference registration system in the separate registration form.
  • Please, make the reservation in advance by August 22, 2024.